The South Carolina Ports Authority (Authority) is requesting Bids for the project identified above. Bidding Documents for this project are only available through download. To download a copy of the Bidding Documents click on the links provided below.
Important Note: It is each Bidders responsibility to periodically check this website for any Addenda that may be issued.
Bidding Documents*
Plans were developed at 24" x 36"and intended to be printed 12" x 18".
Specifications are intended to be printed 8.5" x 11".
Voluntary Plan Holders List:
Add your contact information to the Voluntary Plan Holders List.
Download a current copy of the Voluntary Plan Holders List
Other Documents:
Pre-Bid Conference Sign In sheet
Supplemental Documents:
CIFCRT202C_SD1_Updated Geotechnical_Data_Summary_Report_Rev1
CIFCRT202C_SD2_Marine_Construction_Geotechnical_Data_Supplement
CIFCRT202C_SD3_Test_Embankment_Supplementary_Information
CIFCRT202C_SD4_Final_UXO_Risk_Assessment_and_MM_Report
CIFCRT202C_SD5_Record_Documents_Building_&_Pavement_Demo_Pile_Locations
<CIFCRT202C_SD6_Record_Documents_Upland_Site_Preparation_
CIFCRT202C_SD7_Record_Documents_Containment_Structure
CIFCRT202C_SD8_Record_Documents_Phase_2_3_Area_Demolition
CIFCRT202C_SD9_Record_Documents_Upland_And_Wall_Fill
CIFCRT202C_SD10_Permit_Drawings_ Upland_Site_Preparation
CIFCRT202C_SD11_Permit_Drawings_ Containment_Structure_And_Upland_Fill
CIFCRT202C_SD12_Permit_Drawings_ Upland_And_Tideland_Fill
CIFCRT202C_SD13_Permit_Drawings_ Phase_2_3_Area_Demolition_And_Consolidation
CIFCRT202C_SD14_Daniel_Island_Disposal_Cell_Survey_Information
CIFCRT202C_SD15_Daniel_Island_Disposal_Cell_Geotechnical_Data
CIFCRT202C_SD16_Report_of_ODMDS_Exploration_Report
CIFCRT202C_SD17_Multibeam_Bathymetry_Survey
CIFCRT202C_SD20_CIFCRT204_Plans
CIFCRT202C_SD21_CIFCRT204_Specifications
CIFCRT202C_SD22_CIFCRT204_Addendum_1
CIFCRT202C_SD23_CIFCRT204_Addendum_2
CIFCRT202C_SD24_CIFCRT204_Addendum_3
CIFCRT202C_SD25_OMDMS_EXPLORATION_REPORT_2009
CIFCRT202C_SD26_OMDMS_EXPLORATION_REPORT_2012
CIFCRT202C_SD27_Site_Preparation_Permit_Drawings
CIFCRT202C_SD28_CIFCRT204_Containment_Wall_Remediation_IFC
*By making his Bid, each Bidder represents that he has read and understands the Bidding Documents, and his Bid is made in accordance therewith, has visited the Project site and familiarized himself with the obstacles and conditions that will be encountered during the execution of the work, and has based his Bid upon the materials and methods described in the Bidding Documents without exceptions. Bidders shall promptly notify the Authority of any ambiguity, inconsistency or error, which they may discover upon examination of Bidding Documents, Project site or local conditions. The Authority will make interpretations, corrections or changes to Bidding Documents by written Addendum. Interpretations, corrections or changes made in any other manner will not be binding.